Regulateur TetraLink Charge
Nouveauté produit
Posted on 28.08.2026

With the rise of electric vehicles, charging has become a new challenge for electrical systems. When a vehicle is charging at the same time as the heating system, appliances, or other energy-intensive equipment, the available power capacity can quickly be reached..
To address this issue, we developed TetraLink Charge, a smart charge controller capable of automatically adjusting the charging power based on the system’s overall energy consumption..
Smart charging that adapts to your usage
The principle is simple: TetraLink Charge monitors the power consumed by the system and adjusts the power allocated to charging the electric vehicle.
When consumption increases, the charging power may be reduced. Conversely, when power becomes available again, charging can resume at a higher power level. This dynamic adjustment allows for more efficient use of available power and helps minimize the risk of exceeding the contracted power limit and tripping the circuit breaker.
The system includes a “rate options (Peak/Off-Peak)” feature designed to prioritize periods when electricity is most cost-effective (off-peak hours) while capping the available power during peak hours.
Simplified installation thanks to LoRa technology
Installing a control system can sometimes be complicated when the electric meter is located far from the charging station.
The TetraLink Charge uses LoRa wireless communication, which—in compatible setups—eliminates the need for long cables between the Linky meter and the terminal.
This approach simplifies deployment and can reduce the challenges associated with cable routing. For the installer, this means easier and more flexible integration. For the end customer, it provides the benefits of a smart control system without necessarily requiring major work to physically connect the meter to the terminal.

Communication with the Linky meter is at the heart of the Advenir system
✓ A solution suitable for residential and small commercial installations.
✓ Wireless Communication
LoRa Simplified installation, especially when the Linky meter is located far from the charging station.
✓ Dynamic charging control
The charging power adjusts to the system's overall power consumption.
✓ Reduced risk of circuit breakers tripping
Better control of power demand helps limit the risk of exceeding capacity.
✓ A single TetraLink Charge reference
A single product for both single-phase and three-phase installations
✓ Optimization of available power
Charging is integrated with the building’s other electrical uses.
Toward Smarter Charging
With TetraLink Charge, charging an electric vehicle is no longer limited to supplying a fixed amount of power at the charging station. It becomes a dynamic process, controlled and adapted in real time to the needs of the installation. By leveraging data from the Linky meter and power modulation, TetraLink Charge enables the simultaneous management of electric vehicle charging, power control, and consumption optimization.
TetraLink Charge: A New Way to Smartly Manage Electric Vehicle Charging.